Tape-Out

Tape-out is the point at which a finished chip design is released to the foundry for manufacturing. It marks the end of the design phase.

In more detail

The name comes from the era when design data was delivered on magnetic tape. Today the final layout is transmitted electronically, typically in GDSII or the newer OASIS format.

Before tape-out, the design must pass a series of sign-off checks:

  • Timing, through static timing analysis
  • Design rule checks, confirming the layout can be manufactured
  • Layout versus schematic checks, confirming the layout matches the intended circuit
  • Power integrity and reliability analysis
  • Completion of functional verification

After tape-out, the foundry makes the masks used to pattern each layer and then processes wafers. First chips usually come back some months later, depending on the process.

Why it matters

Tape-out is a commitment. A mask set for an advanced process node costs millions of dollars, and an error found afterward may require new masks and months of delay. That is why so much of a chip project’s effort goes into verification before this point.

It is the central milestone in every chip schedule. Once chips return, work moves to post-silicon validation, which confirms that the manufactured parts behave as designed. A chip that works on its first tape-out is called first-pass silicon, and achieving it is a common project goal.